| TGL | KET | MASUK | KELUAR |
| 30 September 2024 | Kegiatan MT | Rp 4.500.000 | |
| 30 September 2024 | PDAM | Rp 146.700 | |
| 30 September 2024 | ATK | Rp 116.600 | |
| 30 September 2024 | Pelayanan Jamaah (Air Mineral, Kopi, Teh, dll) | Rp 1.451.500 | |
| 30 September 2024 | Lain-lain | Rp 61.346 | |
| 30 September 2024 | Listrik | Rp 3.783.000 | |
| 30 September 2024 | Insentif | Rp 1.425.000 | |
| 30 September 2024 | Perlengkapan Masjid | Rp 2.825.049 |
| Luas Tanah | 1987 m2 |
| Luas Bangunan | 1800 m2 |
| Status Lokasi | Wakaf |
| Tahun Berdiri | 2014 |